Solpower team do inspect the installed structural torques and Module alignments before successful testing and commissioning of the tracker blocks. Only after a checklist of tests performed the tracker will be commissioned for long run.
© 2018 SOLPOWER GREEN PVT.LTD. All rights reserved.